ACREAGE
Total Acres:
Typical Lot Size:
Percent Available: |
|
640
20 to 28 acres
100% |
UTILITIES
Electricity
Current: |
|
2 bus 125kv substation located in northeast corner of area 2 |
| Proposed: |
|
Feeder line along east
boundary and 2 proposed
east to west cross streets |
Gas
Current: |
|
16" high pressure line in the north east corner |
| Proposed: |
|
6" lines along east boundary
and 2 proposed east to west cross streets |
Sewer
Current: |
|
84" main along east boundary |
| Proposed: |
|
10” line along east boundary
and 2 proposed
east to west cross streets |
Water
Current: |
|
20" main in the north east corner |
| Proposed: |
|
12” line along west boundary
and along 2 proposed
east to west cross streets |
ROAD ACCESS
Current: |
|
2 lane ending in north east corner |
| Proposed: |
|
5 lane on east boundary and
two east to west 4 lane streets |
MAJOR CONNECTING INTERSTATES: |
|
Interstates 40 & 55 |
DISTANCE TO AIRPORT: |
|
14.7 miles |
STORM DRAINAGE
Current: |
|
Natural |
| Proposed: |
|
Open ditch and curb and
gutter |
RAIL ACCESS
Current: |
|
CN |
| Proposed: |
|
115 lbs. running east to west
centered in the property |
RAIL CONNECTIONS
Direct Access: |
|
CN |
| Indirect Access: |
|
BNSF, CSX,
NS, UP |
TYPICAL ELEVATION
Low: |
|
204' |
| High: |
|
212' (Levee
protected top elevation 235) |
SOIL TYPES: |
|
Silt Loam, Silty Clay, Fine Sandy Loam |
PRICING POLICY: |
|
Please contact the Port Commission office |