ACREAGE
Total Acres:
Typical
Lot Size:
Percent
Available: |
640
20 to 28 acres
100% |
UTILITIES
Electricity
Current: |
2 bus 125kv substation located in northeast corner of area 2 |
|
Proposed: |
Feeder line along east boundary
and 2 proposed
east to west cross streets |
Gas
Current: |
16" high pressure line in the north east corner |
|
Proposed: |
6" lines along east boundary and
2 proposed east to west cross streets |
Sewer
Current: |
84" main along east boundary |
|
Proposed: |
10” line along east boundary and 2 proposed
east to west cross streets |
Water
Current: |
20" main in the north east corner |
|
Proposed: |
12” line along west boundary and
along 2 proposed
east to west cross streets |
ROAD ACCESS
Current: |
2 lane ending in north east corner |
|
Proposed: |
5 lane on east boundary and two
east to west 4 lane streets |
MAJOR CONNECTING INTERSTATES: |
Interstates 40 & 55 |
DISTANCE TO AIRPORT: |
14.7 miles |
STORM DRAINAGE
Current: |
Natural |
|
Proposed: |
Open ditch and curb and gutter |
RAIL ACCESS
Current: |
CN |
|
Proposed: |
115 lbs. running east to west
centered in the property |
RAIL CONNECTIONS
Direct Access: |
CN |
|
Indirect Access: |
BNSF, CSX, NS, UP |
TYPICAL ELEVATION
Low: |
204' |
|
High: |
212' (Levee protected
top elevation 235) |
SOIL TYPES: |
Silt Loam, Silty Clay, Fine Sandy Loam |
PRICING POLICY: |
Please contact the Port Commission office |
PHOTO |
 |