Typical Lot Description
 

ACREAGE
      Total Acres:
      Typical Lot Size: 
     
Percent Available: 
                      
830
21 to 38 acres
100%

UTILITIES
Electricity
      Current: 



2 bus substation, 125kv north area 2
      Proposed: Feeder lines
Gas
      Current:

16” high pressure line in north east corner
      Proposed: Not yet determined
Sewer
      Current:

60" main along west boundary line
      Proposed: Not yet determined
Water
      Current: 

20" main along west boundary line
      Proposed:  Not yet determined

ROAD ACCESS
      Current: 


2 lane along west boundary line
      Proposed:  Expansion of 2 to 5 lanes on west boundary line. Others to be determined later

MAJOR CONNECTING INTERSTATES: 

Interstates 40 & 55

DISTANCE TO AIRPORT: 

14.7 miles

STORM DRAINAGE
      Current: 


Natural drainage and 2 earthen ditches running east to west 5’ to 20’ depth
      Proposed: Not yet determined

RAIL ACCESS
      Current:


CN/IC line along north boundary line
      Proposed: Not yet determined

RAIL CONNECTIONS
      Direct Access: 


CN/CSX
      Indirect Access: BNSF, CSX, NS, UP

TYPICAL ELEVATION
      Low:


205'
      High: 212' (Levee protected top elevation 235)

SOIL TYPES: 

Silt Loam, Silty Clay, Fine Sandy Loam

PRICING POLICY: 

Please contact the Port Commission office

Contact Memphis Light, Gas and Water for detailed information on line locations and capabilities at 901-544-6549. For sewer line issues contact City of Memphis Engineering Department, Sewer Design at 901-576-6951. For the location of underground utilities dial 800-351-1111.