ACREAGE
Total Acres:
Typical Lot Size:
Percent Available: |
|
830
21 to 38 acres
100% |
UTILITIES
Electricity
Current: |
|
2 bus substation, 125kv north area 2 |
| Proposed: |
|
Feeder lines |
Gas
Current: |
|
16” high pressure line in north east corner |
| Proposed: |
|
Not yet determined |
Sewer
Current: |
|
60" main along west boundary line |
| Proposed: |
|
Not yet determined |
Water
Current: |
|
20" main along west boundary line |
| Proposed: |
|
Not yet determined |
ROAD ACCESS
Current: |
|
2 lane along west boundary line |
| Proposed: |
|
Expansion of 2 to 5 lanes
on west boundary line. Others to be determined later |
MAJOR CONNECTING INTERSTATES: |
|
Interstates 40 & 55 |
DISTANCE TO AIRPORT: |
|
14.7 miles |
STORM DRAINAGE
Current: |
|
Natural drainage and 2 earthen ditches running east
to west 5’ to 20’ depth |
| Proposed: |
|
Not yet determined |
RAIL ACCESS
Current: |
|
CN/IC line along north boundary line |
| Proposed: |
|
Not yet determined |
RAIL CONNECTIONS
Direct Access: |
|
CN/CSX |
| Indirect Access: |
|
BNSF, CSX,
NS, UP |
TYPICAL ELEVATION
Low: |
|
205' |
| High: |
|
212' (Levee
protected top elevation 235) |
SOIL TYPES: |
|
Silt Loam, Silty Clay, Fine Sandy Loam |
PRICING POLICY: |
|
Please contact the Port Commission office |