ACREAGE
Total Acres:
Typical
Lot Size:
Percent
Available: |
145
29 lots, 2, 13 acre lots and 2, 27 acre lots
100% |
UTILITIES
Electricity
Current: |
2 bus - 125kv substation across street to west and
feeder lines |
|
Proposed: |
Feeder lines along 2 proposed
north to south cross streets |
Gas
Current: |
6” in the Ensley "A" subdivision along north boundary |
|
Proposed: |
6” line along 2 proposed north to
south cross streets |
Sewer
Current: |
10" in the Ensley "A" subdivision along north
boundary |
|
Proposed: |
10” line along 2 proposed north
to south cross streets |
Water
Current: |
12" in the Ensley "A" subdivision along north
boundary |
|
Proposed: |
12” line along 2 proposed north
to south cross streets |
ROAD ACCESS
Current:
|
5 lane and 2 lane running east to west in Ensley "A"
subdivision |
|
Proposed: |
2 north to south 4 lane and 1
east to west 4 lane in the south |
MAJOR CONNECTING INTERSTATES: |
Interstates 40 & 55 |
DISTANCE TO AIRPORT: |
12.0 miles |
STORM DRAINAGE
Current: |
Natural and curb and gutter in the Ensley "A"
subdivision |
|
Proposed: |
Open ditch or curb
and gutter |
RAIL ACCESS
Current: |
CN 300 feet from north boundary |
|
Proposed: |
115lbs. lines running
north to south along the west boundary line and west of the
east boundary line |
RAIL CONNECTIONS
Direct Access:
|
CN |
|
Indirect Access: |
BNSF, CSX, NS,
UP |
TYPICAL ELEVATION
Low: |
204' |
|
High: |
212' (Levee protected
top elevation 235) |
SOIL TYPES: |
Silt Loam, Silty Clay, Fine Sandy Loam |
PRICING POLICY: |
Please contact the Port Commission office |
PHOTO |
 |