ACREAGE
Total Acres:
Typical Lot Size:
Percent Available: |
|
220
35 to 46 acres
99% |
UTILITIES
Electricity
Current: |
|
2 bus substation, 125 kv |
| Proposed: |
|
3 east to west feeder lines
in the north, middle and south |
Gas
Current: |
|
16" high-pressure along east boundary |
| Proposed: |
|
3 - 6” lines, two running
east to west in north and along south boundary, one along
west boundary |
Sewer
Current: |
|
90" along east boundary |
| Proposed: |
|
6” lines on north, south
and west boundary. 6” west to east lines along north middle
and south cross streets |
Water
Current: |
|
20" main along east boundary |
| Proposed: |
|
12” line along west boundary.
12” west to east lines along north, middle and south cross
streets |
ROAD ACCESS
Current:
|
|
2 lane (wide) on east boundary |
| Proposed: |
|
4 lane east to west roads
on north, north central, south central and south. Expansion
to 5 lanes on east boundary |
MAJOR CONNECTING INTERSTATES: |
|
Interstates 40 & 55 |
DISTANCE TO AIRPORT: |
|
12.7 miles |
STORM DRAINAGE
Current: |
|
Natural |
| Proposed:
|
|
Open ditch
or curb and gutter |
RAIL ACCESS
Current: |
|
None (closest is 3/4 mile north) |
| Proposed:
|
|
2 lines of 115 lbs. rail
running east to west in north and south central |
RAIL CONNECTIONS
Direct Access:
|
|
CN |
| Indirect Access:
|
|
BNSF, CSX,
NS, UP |
TYPICAL ELEVATION
Low: |
|
206' |
| High: |
|
213' (Levee
protected top elevation 235) |
SOIL TYPES: |
|
Silt Loam, Silty Clay, Fine Sandy Loam |
PRICING POLICY: |
|
Please contact the Port Commission office |