ACREAGE
Total Acres:
Typical
Lot Size:
Percent
Available: |
220
35 to 46 acres
99% |
UTILITIES
Electricity
Current: |
2 bus substation, 125 kv |
|
Proposed: |
3 east to west feeder lines in
the north, middle and south |
Gas
Current: |
16" high-pressure along east boundary |
|
Proposed: |
3 - 6” lines, two running east
to west in north and along south boundary, one along west boundary |
Sewer
Current: |
90" along east boundary |
|
Proposed: |
6” lines on north, south and west
boundary. 6” west to east lines along north middle and south
cross streets |
Water
Current: |
20" main along east boundary |
|
Proposed: |
12” line along west boundary. 12”
west to east lines along north, middle and south cross streets |
ROAD ACCESS
Current:
|
2 lane (wide) on east boundary |
|
Proposed: |
4 lane east to west roads on north,
north central, south central and south. Expansion to 5 lanes
on east boundary |
MAJOR CONNECTING INTERSTATES: |
Interstates 40 & 55 |
DISTANCE TO AIRPORT: |
12.7 miles |
STORM DRAINAGE
Current: |
Natural |
|
Proposed: |
Open ditch or curb
and gutter |
RAIL ACCESS
Current: |
None (closest is 3/4 mile north) |
|
Proposed: |
2 lines of 115 lbs. rail running
east to west in north and south central |
RAIL CONNECTIONS
Direct Access:
|
CN |
|
Indirect Access: |
BNSF, CSX, NS,
UP |
TYPICAL ELEVATION
Low: |
206' |
|
High: |
213' (Levee protected
top elevation 235) |
SOIL TYPES: |
Silt Loam, Silty Clay, Fine Sandy Loam |
PRICING POLICY: |
Please contact the Port Commission office |
PHOTO |

|