ACREAGE
Total Acres:
Typical Lot Size:
Percent Available: |
|
210
18
100% |
UTILITIES
Electricity
Current: |
|
2 bus substation, 125 kv |
| Proposed: |
|
Feeder lines
along east and north boundary |
Gas
Current: |
|
16" high-pressure along east boundary |
| Proposed: |
|
6" along north
and west boundary line |
Sewer
Current: |
|
90" along east boundary |
| Proposed: |
|
10" along
south boundary |
Water
Current: |
|
20" main along east boundary |
| Proposed: |
|
12" along
north and west boundary |
ROAD ACCESS
Current:
|
|
4 lane with center turn lane along east boundary
line |
| Proposed: |
|
4 land along
north and west boundary line |
MAJOR CONNECTING INTERSTATES: |
|
Interstates 40 & 55 |
DISTANCE TO AIRPORT: |
|
12.6 miles |
STORM DRAINAGE
Current: |
|
Natural |
| Proposed:
|
|
Open ditch
or curb and gutter |
RAIL ACCESS
Current: |
|
1,000 yards north of area |
| Proposed:
|
|
115 lbs. along
southern boundary |
RAIL CONNECTIONS
Direct Access:
|
|
CN |
| Indirect Access:
|
|
BNSF, CSX,
NS, UP |
TYPICAL ELEVATION
Low: |
|
210' |
| High: |
|
220' (Levee
protected top elevation 235) |
SOIL TYPES: |
|
Silt Loam, Silty Clay, Fine Sandy Loam |
PRICING POLICY: |
|
Please contact the Port Commission office |