ACREAGE
Total Acres:
Typical Lot Size:
Percent Available: |
210
18
100% |
UTILITIES
Electricity
Current: |
2 bus substation, 125 kv |
| Proposed: |
Feeder lines along
east and north boundary |
Gas
Current: |
16" high-pressure along east boundary |
| Proposed: |
6" along north
and west boundary line |
Sewer
Current: |
90" along east boundary |
| Proposed: |
10" along south
boundary |
Water
Current: |
20" main along east boundary |
| Proposed: |
12" along north
and west boundary |
ROAD ACCESS
Current:
|
4 lane with center turn lane along east boundary
line |
|
Proposed: |
4 land along north
and west boundary line |
MAJOR CONNECTING INTERSTATES: |
Interstates 40 & 55 |
DISTANCE TO AIRPORT: |
12.6 miles |
STORM DRAINAGE
Current: |
Natural |
|
Proposed: |
Open ditch or curb
and gutter |
RAIL ACCESS
Current: |
1,000 yards north of area |
|
Proposed: |
115 lbs. along
southern boundary |
RAIL CONNECTIONS
Direct Access:
|
CN |
|
Indirect Access: |
BNSF, CSX, NS,
UP |
TYPICAL ELEVATION
Low: |
210' |
|
High: |
220' (Levee protected
top elevation 235) |
SOIL TYPES: |
Silt Loam, Silty Clay, Fine Sandy Loam |
PRICING POLICY: |
Please contact the Port Commission office |
PHOTO |
 |